We over SEA all your needs!
At the Sewage Enforcement Agency, our mission is to provide TOP-QUALITY local services to our customers and Townships. We maintain a STRONG commitment to our customer service and satisfaction.
Services Provided
A Pit and Perc Test determines if your property is suitable for a septic system. A test pit is dug to evaluate soil conditions, and a percolation test measures how well water drains through the ground.
This process ensures proper sewage system function and meets local health and environmental requirements.
This is the first 2 steps of the NEW ON LOT permit process
An Existing System Inspection is required during subdivision when a property’s sewage system has not been evaluated within the past calendar year. This inspection ensures the current system is functioning properly and meets local regulations.
It helps verify system performance before subdivision approval and protects future property use.
A 10-Acre (Rural) Exemption allows certain properties to be excluded from full sewage planning requirements. Qualifying properties may use individual on-lot septic systems without extensive testing or permitting.
To be eligible, the property must meet local criteria, including being at least 10 acres and remaining in the immediate family’s ownership since 1985, with proper deed documentation to verify.
A Non-Building Waiver is used during subdivision when a newly created lot is not intended for development. This waiver confirms that no sewage system will be installed and no building will take place on that parcel.
It helps simplify the subdivision process while ensuring compliance with local sewage regulations.
Access all required forms for sewage planning, testing, inspections, and exemptions in one place.
Please ensure each form is completed accurately and includes any necessary documentation before submission to avoid delays.
Forms
Payment Options
COMING SOON
-
-
-
-
Have a Question?
Send us a note or give us a call, and let’s figure things out together.